環迴北路及39區路(近敬文書院)之臨時道路封閉
為配合校園北陲學生宿舍(A3及A4座)工程,環迴北路及39區路近敬文書院道路及行人路將於2018年5月25日至2018年6月25日期間(08:00-18:00),實施封閉措施(見附圖)。不便之處,敬請原諒。
TEMPORARY CLOSURE OF ROAD AT CAMPUS CIRCUIT NORTH AND AREA 39 DRIVE NEAR C. W. CHU COLLEGE
To facilitate the construction works at New Student Hostel site, part of Pedestrian pavement and Traffic Road at Campus Circuit North and Area 39 Drive along the portion of the New Student Hostel site area will be temporary closure from 25 May 2018 to 25 June 2018 (24 hrs). Please refer to below diagrams for the location. We apologize for any inconvenience caused.
Click Images to enlarge
Contact us: cdo@cuhk.edu.hk